Infrastructure Improvements


Bethlehem Elementary

  • Replace perimeter fencing
  • Reconfige / renovate main entrance
  • Replace interior doors and hardware
  • Replace interior ceilings
  • Remove and replace carpet and flooring tile
  • Remove and replace roofing
  • Remove and replace exterior windows with security glazed fixed windows
  • Remove glass block in gym and replace with translucent panels
  • Renovate canopy soffit
  • Upgrade HVAC and controls
  • Upgrade fire system throughout building

 Bridge Street Middle School

  • Upgrade / renovate access drive to front entrance
  • Repair subgrade entry and light-well stairs and slabs to eliminate water entry
  • Renovate existing locker rooms
  • Relocate and renovate main entrance to original front side, includes security vestibule
  • Renovate basement computer lab to provide updated space for lab and strings classroom
  • Remove and replace roof
  • Remove and replace ground floor and basement windows
  • Remove and replace interior doors and hardware
  • Remove and replace exterior doors and hardware
  • Remove and replace flooring
  • Install new SAT ceilings throughout
  • Upgrade electrical and fire alarm systems
  • Upgrade HVAC / isolate data rooms
  • Provide sprinkler system

Elm Grove Elementary

  • Upgrade drop-off and bus loading zones
  • Upgrade site security fence and paved surfaces
  • Provide permanent separations between shared classrooms
  • Replace classroom locks / door hardware
  • Renovate cafeteria to increase dining room size
  • Renovate entrance to provide security separation from the main school area
  • Reconfigure security doors / system in vestibule
  • Replace roofing for entire building
  • Remove and replace carpet
  • Remove and replace gymnasium flooring
  • Remove and replace lay-in ceiling systems
  • Remove pipe wrap
  • Replace existing HVAC systems and controls
  • Replace fire alarm system, sprinkler heads, and upgrade tie-in to fire alarm for existing sprinkler system

Madison Elementary

  • Upgrade drop-off area, bus loading zone, playground area, and parking
  • Upgrade site fencing
  • Upgrade site sewage
  • Repair plaster
  • Replace PA system
  • Renovate kitchen and dining area
  • Upgrade school entrance and add ADA ramp / lift
  • Upgrade auditorium first floor entrance
  • Replace roofing and add lightning protection
  • Restore and repair building masonry
  • Replace exterior windows and doors
  • Remove piping wrap and 9" tile
  • Replace flooring
  • Replace ceilings
  • Replace fire alarm and sprinkler systems

Middle Creek Elementary

  • Upgrade drop-off and bus loading zones
  • Upgrade site security fence and paved surfaces
  • Provide permanent separations between shared classrooms
  • Replace classroom locks / door hardware
  • Renovate cafeteria to increase dining room size
  • Renovate entrance to provide security separation from the main school area
  • Reconfigure security doors / system in vestibule
  • Replace roofing for entire building
  • Remove and replace carpet
  • Remove and replace gymnasium flooring
  • Remove and replace lay-in ceiling systems
  • Remove pipe wrap
  • Replace existing HVAC systems and controls
  • Replace fire alarm system, sprinkler heads, and upgrade tie-in to fire alarm for existing sprinkler system

Ritchie Elementary

  • Pave playground and parking areas
  • Add site and security lighting
  • Upgrade HVAC in 1976 addition
  • Add heat to stair towers
  • Provide window blinds throughout building
  • Remove and replace carpet in classrooms
  • Update security camera system, add additional exterior and interior cameras
  • Update fire alarm devices
  • Repair drinking fountains, convert to ADA compliant fountains
  • Address water leaks within the pool basin, modify piping terminations to pool

 Steenrod Elementary

  • Add 10 parking spaces
  • Repair existing damaged concrete curbing in parking lot
  • Construct 6000 square foot Kitchen / Cafeteria addition
  • Renovate school entrance
  • Remove and replace exterior windows
  • Remove and replace interior doors
  • Upgrade HVAC and controls
  • Remove and replace roofing

Triadelphia Middle School

  • Annex will be replaced with a three story 22,250 square foot addition which will be connected to the main building
  • Relocate / reconfigure service drive, parking, and walkways of addition
  • New stairs between Steenrod and Triadelphia Middle
  • Remove and replace HVAC systems
  • Remove and replace flooring
  • Update data and electrical systems
  • Remove and replace main building roof
  • Remove and replace gymnasium bleachers

Warwood School

  • Add site and security lighting
  • Add wall mounted security lighting around entire facility
  • Renovate 8,200 square feet, to combine elementary and middle school kitchens into one kitchen
  • Renovate dining spaces in elementary and middle school
  • Remove and replace all exterior windows with security glazed fixed windows
  • Provide window blinds throughout building
  • Remove and replace flooring throughout classrooms and building
  • Update drinking fountains to ADA compliance
  • Provide a sprinkler system throughout elementary school
  • Replace electrical panels in elementary school
  • Re-locate IDF from elevator room
  • Remove and replace roofing on elementary school and 1975 additions
  • Remove and replace damaged doors throughout building
  • Remove water damaged plaster, repair and paint the area
  • Add security vestibule at main entrance for elementary and middle school

West Liberty Elementary

  • Add exterior safety and security lighting
  • Reconfigure 4 north side classrooms to add 1 classroom
  • Eliminate open connections between classrooms
  • Renovate office and security vestibule to create secure area
  • Remove and replace exterior windows with security glazed fixed windows and translucent panels in the gymnasium
  • Remove and replace carpet
  • Remove and replace gymnasium flooring
  • Upgrade HVAC system and controls
  • Repair façade and exterior masonry
  • Replace interior door hardware

Wheeling Middle School

  • Add 10 parking spaces
  • Add exterior safety and security lighting
  • Add 2 story 4,350 square foot security entrance addition, includes stairs and elevator
  • Remove and replace galvanized domestic water piping with copper piping
  • Remove and replace retractable gymnasium bleachers
  • Renovate autism classrooms
  • Remove and replace movable classroom partitions with permanent walls
  • Add new glass separation wall between Media Center and corridor
  • Reconfigure space to add a Maker-Space
  • Remove and replace science casework counter-tops and work tables
  • Remove and replace lay-in ceiling tiles
  • Upgrade HVAC system and controls
  • Remove and replace exterior windows and doors

Wheeling Park High School

  • Construct 2 story 4,000 square foot addition, includes security entrance, stairs / elevator, canopy for drop-off loop, and access to media center
  • Construct 3,400 square foot addition, includes wrestling practice room, office space, locker rooms
  • Construct restroom facilities at WPHS track
  • Construct 1,000 square foot addition, J.B. Chambers P.A.C. storage space
  • Reconfigure 12,500 square feet of science labs
  • Renovate 13,500 square feet of existing media center
  • Renovate and reconfigure main office area to account for main entrance addition
  • Renovate and update music and performing arts space, 11,800 square feet
  • Renovate 4,600 square feet of current kitchen space
  • Renovate locker rooms, update locker and shower rooms to ADA and code compliance
  • Correct flooring in foundation in select locations
  • Remove and replace overhead doors in CTE areas
  • Remove and replace HVAC equipment and controls
  • Remove and replace select locations of roofing
  • Upgrade swimming pool operational equipment
  • Remove and replace exterior windows
  • Upgrade main electrical service
  • Remove and replace retractable main gymnasium bleachers

Woodsdale Elementary

  • Bus loading / parking area and drainage improvements
  • Add exterior signage
  • Electrical, fire, and HVAC systems will be upgrade to support renovations
  • Kitchen / Cafeteria addition of 1 story 1,600 square feet
  • Renovate main office area to create a "man trap" at school entrance
  • Replace classroom locks / door hardware
  • Reconfigure classrooms into more usable space
  • Replace interior ceilings throughout
  • Create receiving area
  • New carpet in classrooms
  • New tile in hallways
  • Repair exterior masonry and lintels
  • Remove and replace exterior windows
  • Replace exterior doors and door frames
  • Accessibility upgrades to exterior slabs
  • Replace interior doors
  • Remove and replace HVAC equipment and controls